A new Davis-Standard film line will add up to 3 million lb of annual nanolayer dielectric film capacity by early 2028 as grid and data center demand climbs.
Case studies from mining, chemical, and petrochemical plants show overhauls and upgrades raising availability from 62% to 88% and cutting maintenance costs 60%.
In tests on maraging steel, open-loop and PID builds collapsed or missed their target height, while Nidec’s adaptive control system completed both builds.
Compressed air can account for up to a third of a plant’s electricity, and drying and blow-off is often the easiest place to cut it. Learn the ladder from open pipe to blower,...
The 100-kVA transformer meets high-voltage isolation requirements without potting its primary coil, which Sumida says could simplify production of SST magnetics.