In 2011, Pittsburgh Corning began assembly of its glass block systems in an under-utilized warehouse at its Port Allegany, Penn., manufacturing location. To prepare the warehouse for assembly operations, the company needed to create a climate-controlled, low-dust environment. Further, the warehouse measured 100 feet wide by 400 feet long—but assembly operations required only a portion of the total area.